The ISRP reviews individual fish and wildlife projects funded by
Bonneville Power Administration and makes recommendations on matters
related to those projects. See background and
membership.
Newest documents are listed first. Document number assumes
"ISRP" prefix (like ISRP 2010-1).
| Number |
Title |
| 2010-7 |
Initial Review of
BiOp Fast Track Research, Monitoring, and Evaluation Proposals
|
| 2010-6 |
Preliminary Review of
Six 2010 Estuary Proposals submitted for the U.S. Army Corps of
Engineers’ Anadromous Fish Evaluation Program |
| 2010-5 |
Review of Accord
Proposal, Upper Lemhi River – Acquisition (#2008-601-00) – Response
Request |
| 2010-4 |
Review of BiOp Proposal
to Study Non-native Predator Impacts on Salmon - Revised Proposal
Requested |
| 2010-3 |
Review
of Big Canyon Watershed Project |
| 2010-2 |
Review of the Yakama
Nation’s Accord Proposal, Columbia Cascade Province MOA Habitat
Projects (2009-003-00) |
| 2010-1 |
Step-Three Review of
the Chief Joseph Dam Hatchery Program, Project #2003-023-00,
Monitoring and Evaluation Plan |
| 2009-57 |
Qualification
Review of Accord Proposal, Expanded Multi-Species Acclimation
Wenatchee/Methow (2009-001-00) |
| 2009-56 |
Qualification
Review for Accord Proposal, Resident Fish Research, Monitoring, and
Evaluation proposal (2008-109-00) |
| 2009-55 |
Final Review of
Accord Proposal, Yakama Nation Status and Trend Annual Report
(2009-002-00) |
| 2009-54 |
Response Review of
Accord proposal, Basinwide Supplementation Evaluation – Phase I
(2009-009-00) - Objective 1 |
| 2009-53 |
ISRP Review of the
Shoshone-Bannock Tribes’ Salmon River Basin Nutrient Enhancement
Accord proposal (2008-904-00) |
| 2009-52 |
Response Request for Accord Proposal, Genetic stock structure,
relative productivity and migration (gene flow) of white sturgeon
among Bonneville, The Dalles, John Day and McNary reservoirs in the
lower mid-Columbia River region (2008-504-00) |
| 2009-51 |
Follow-up Review of
Accord Proposal, Twin Lakes Enhancement Proposal (2008-111-00) |
| 2009-50 |
Final Review of the
Yakama Nation’s Accord Proposal, Upper Columbia Nutrient
Supplementation (2008-471-00) |
| 2009-49 |
Follow-up review of
the Confederated Tribes of the Warm Springs Reservation Fish Accord
Proposal: Deschutes River Restoration Program (2008-301-00) |
| 2009-48 |
ISRP FY 2007-09
Follow-up Review of Wenatchee Complexity Project, 200732500: Site
CMZ C6 |
| 2009-47 |
Response Request
for Step Review of the Mid-Columbia Coho Restoration Master Plan
(#1996-040-00) |
| 2009-46 |
ISRP Review of
Bitterroot and Blackfoot Subbasin Plans |
| 2009-45 |
ISRP Final Review
of Warm Springs' Lamprey Accord Proposal for Fifteenmile Creek and
Hood River Subbasins (2007-007-00) |
| 2009-44 |
Final Review of
Accord Proposal, Resident Fish RME proposal (2008-109-00) |
| 2009-43 |
Review of AFEP
project - Statistical Design for the Lower Columbia River
Acoustic-Tag Investigations of Dam Passage Survival and Associated
Metrics |
| 2009-42 |
Review of the
Yakama Nation’s Accord Proposal, Columbia Cascade Province MOA
Habitat Projects (2009-003-00) |
| 2009-41 |
Review of Twin
Lakes Enhancement Proposal (2008-111-00) |
| 2009-40 |
Preliminary Step 1
Review of the Kootenai River Native Fish Conservation Aquaculture
Program |
| 2009-39 |
Final review of the
Yakama Nation’s Upper Columbia Kelt Reconditioning Program (2008-458-00) |
| 2009-38 |
Review of Accord
Proposal, Yakama Nation Status and Trend Annual Report (2009-002-00) |
| 2009-37 |
Review of Accord
Proposal, Produce Statistically Valid Harvest Estimates
(2008-508-00) - Response Requested |
| 2009-36 |
Follow-up Review of
FY 2007 – 09 Proposal 2007-034-00: Columbia Cascade Pump Screen
Correction (Response Requested) |
|
2009-35 |
Final review of the Confederated Tribes of the Warm Springs
Reservation Fish Accord Proposal: Deschutes River Restoration
Program (2008-301-00) |
| 2009-34 |
Review of Accord
Proposal, Resident Fish Research, Monitoring, and Evaluation
proposal (#2008-109-00) |
| 2009-33 |
Response Request
for Accord Proposal, Monitoring Recovery Trends in Key Spring
Chinook Habitat Variables and Validation of Population Viability
Indicators (2009-004-00) |
| 2009-32 |
ISRP Response
Request for Twin Lakes Enhancement Proposal (2008-111-00), an
Accord project |
| 2009-31 |
Review of Idaho
Department of Fish and Game’s Revised Southern Idaho Wildlife
Mitigation projects (1995-057-00 and -01) |
| 2009-30 |
Review of Accord
Proposal, Rufus Woods Reservoir Redband Broodstock Net Pens
(2008-117-00) |
|
2009-29 |
Review of Wenatchee
Complexity Project (2007-325-00): Site CMZ N4 |
| 2009-28 |
Final Review of
BiOp proposal Chum Salmon Enhancement in the Lower Columbia River
(2008-710-00) |
| 2009-27 |
Review of the
Yakama Nation’s Accord Proposal, Upper Columbia Nutrient
Supplementation (2008-471-00) |
| 2009-26 |
Response Requested
for Accord Proposal, Salmon River Basin Nutrient Enhancement
(2008-904-00) |
| 2009-25 |
Final review of the
Columbia River Fish Accord proposal, Deschutes River Fall Chinook
Research and Monitoring (2008-306-00) |
| 2009-24 |
Review of Accord Proposal, Pacific Lamprey Passage Design (2008-524-00) |
| 2009-23 |
Review of Accord Proposal, Willamette Falls Lamprey Escapement Estimate (2008-308-00) |
|
ISRP/ISAB 2009-2 |
ISRP and ISAB Comments
on the Council's March 2009 Proposed High Level Indicators |
| 2009-22 |
Final Review of Yakama Sturgeon Management Project (2008-455-00) |
|
2009-21 |
Final review of the
Columbia River Fish Accord proposal, Sea Lion Predation Rate
Estimation and Non-lethal Hazing (2008-004-00) |
|
2009-20 |
Review of CTUIR Ceded
Area Priority Stream Corridor Conservation and Protection
(2008-207-00) |
|
2009-19 |
Review of Accord
proposal, Basinwide Supplementation Evaluation – Phase I
(2009-009-00) |
|
2009-18 |
Review of Accord
proposal, Sockeye Studies (2008-503-00) |
|
2009-17 |
Final Review of 2009
Wildlife Proposals |
|
2009-16 |
Review of Lake Roosevelt
Fisheries Guiding Document |
|
2009-15 |
Cassimer Bar Hatchery
Master Plan Step-One Review |
|
2009-14 |
Review of BiOp proposal
Chum Salmon Enhancement in the Lower Columbia River (2008-710-00)
|
|
2009-13 |
Final Review of the
Proposed Scope Expansion of the Project Restore Potlatch River
Watershed (2002-061-00) |
|
2009-12 |
ISRP Step-Two Review of
the Chief Joseph Dam Hatchery Program (2003-023-00) |
|
2009-11 |
Final Review of Scope
Expansion for the Project Reestablish Connectivity and Restore Fish
Habitat in the East Fork of the South Fork Salmon River Watershed
(2007-127-00) |
|
2009-10 |
Review of two Columbia
River Basin Fish Accord Proposals: White Sturgeon and Multi-Species
Acclimation (2007-155-00 and 2009-001-00) |
|
2009-9 |
Response review of the
Columbia River Fish Accord proposal Yakama Nation Pacific Lamprey
Program (2008-470-00) |
|
2009-8 |
Final Review of the
Proposed Scope Expansion of the Project Restore Potlatch River
Watershed |
|
2009-7 |
ISRP Preliminary Wildlife
Category Review |
|
2009-6 |
Step One Review of the
Mid-Columbia Coho Restoration Master Plan (1996-040-00) |
|
2009-5 |
Review of two Columbia
River Fish Accord Proposals: Lyons Ferry Adult Holding and Yakama
Nation Lamprey |
|
2009-4 |
FY 2007-09 Follow-up
Review of Wenatchee Complexity Project (2007-325-00): Sites CMZ 11 and
4 |
|
2009-3 |
Review of CRITFC Fish
Accord Proposal: Influence of Environment and Landscape on Salmonid
Genetics (2009-005-00) |
|
2009-2 |
Response Requested — Step
Two Review of the Chief Joseph Dam Hatchery Program, Project (2003-023-00) |
|
ISAB/ISRP 2009-1 |
Tagging Report: A
comprehensive review of Columbia River Basin fish tagging
technologies and programs |
|
2009-1 |
ISRP Response Request
— Review of Scope Expansion for the Project Reestablish Connectivity
and Restore Fish Habitat in the East Fork of the South Fork Salmon
River Watershed (2007-127-00) |
|
2008-15 |
ISRP General Comments on
the First Set of 11 Columbia River Fish Accord Proposals and Final
Review of the Proposal “Genetic Assessment of Columbia River Stocks |
|
2008-14 |
Review of the Walla Walla
Spring Chinook Master Plan |
|
2008-13 |
FY 2007-09 Follow-up
Review of Wenatchee Complexity Project (2007-325-00) |
|
2008-12 |
ISRP Sekokini Springs
Step Review 2008 |
|
2008-11 |
Review of the Yankee Fork
Floodplain Restoration Project Implementation Plan for 2008-2018 |
|
2008-10 |
Review of the Revised
Hood River Production Program Master Plan: Step One of the Council’s
Three-Step Review Process |
|
2008-9 |
Review of the Grande Ronde
Basin Fish Habitat Project Summary Report, 1984-2007 for the ODFW
Blue Mountain Oregon Fish Habitat Improvement Project (1984-025-00) |
|
2008-8 |
Final Review of June 2008
Results Report and Project Response for the Mainstem, Middle Fork,
John Day Rivers Fish Habitat Enhancement Project (1984-021-00) |
|
2008-7 |
Metrics Review |
|
2008-6 |
Review of the March 2008
Yakama Nation’s Klickitat Anadromous Fisheries Master Plan |
|
2008-5 |
Final Review of Results
Report and February 2008 Project Response for the Mainstem, Middle
Fork, John Day Rivers Fish Habitat Enhancement Project (1984-021-00) |
|
2008-4 |
Retrospective Report 2007 |
|
2008-3 |
Review of Updated Study
Plans for the Rufus Woods Supplementation and Creel Project |
|
2008-2 |
Preliminary Step-Two
Review of the Chief Joseph Dam Hatchery Program Master Plan |
|
2008-1 |
Review of the
Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) |
|
2007-18 |
Review of Ecological
Restoration Strategies for Lapwai and Big Canyon Creeks |
|
2007-17 |
Review of Project
2007-405-00 Rufus Woods Supplementation and Creel Project |
|
2007-16 |
Step Review of
Sekokini Springs Isolation Facility |
|
2007-15 |
Umatilla Initiative
Review |
|
2007-14 |
Input on Evaluation of
Regional Coordination Projects |
|
2007-13 |
Preliminary ISRP Review
of Project 2007-405-00 Rufus Woods Supplementation and Creel Project |
|
2007-12 |
Results Report of the
Grand Ronde Model Watershed Program Habitat Restoration - Planning,
Coordination, and Implementation Project, 1992-026-01 |
|
2007-11 |
Review of Combined
Habitat Assessment Protocols (CHAP) work element in Project
200600600, Habitat Evaluation Procedures (HEP) |
|
2007-10 |
Lake Roosevelt Kokanee
Program Review |
|
2007-9 |
Review of FY 2007-09
Innovative Proposals |
|
2007-8 |
Review of the ISEMP John
Day Study Plan |
|
2007-7 |
Review of the latest
revision of the FY 2007-09 proposal 199101901 (dated 05/25/07),
Hungry Horse Mitigation/Flathead Lake |
|
2007-6 |
FY 2007-09 Follow-up
Review of the Shoshone-Bannock Tribes’ Southern Idaho Wildlife
Mitigation Project 199505702 |
|
2007-5 |
Final Review of Proposal
2003-063-00 |
|
2007-4 |
Review of Desert Wildlife
Area O&M proposal |
ISRP/IEAB
2007-3 |
SAFE Review 2007 |
|
2007-2 |
Response Loop Review of FY
2007 – 09 Proposal 2007-034-00: Columbia Cascade Pump Screen
Correction |
|
2007-1 |
2006 Retrospective Report |
|
2006-7 |
Framework for ISRP Review
of New and Ongoing Projects for the Columbia River Basin Fish and
Wildlife Program |
|
2006-6 |
FY 2007-09
Final Review of Proposals |
|
2006-5 |
Review of the Mid-Columbia
Coho Restoration Master Plan |
|
2006-4 |
Preliminary Review of FY
2007-09 Proposals for the Columbia River Basin Fish and Wildlife
Program |
|
2006-3 |
Response Review of Fiscal
Year 2006 Proposal, "An Acoustic Tracking Array for Studying Ocean
Survival and Movements of Columbia River Salmon (2003-114-00)" |
|
2006-2 |
Response Review of FY 2006
Proposal, Estuary RM&E Pilot Project |
|
2006-1 |
Review of Salmon Subbasin
Pilot Projects Monitoring and Evaluation Plan |
|
2005-20 |
Review of the Draft
Columbia River Basin Research Plan |
|
2005-19 |
Review of Fiscal Year
2006 Proposal, Acoustic Tracking for Studying Ocean Survival |
|
2005-18 |
Review of the Updated
Study Design and Statistical Analysis of Idaho Supplementation Studies |
|
2005-17 |
Review of Fiscal Year
2006 Proposals for the Estuary and Columbia Cascade |
|
2005-16 |
Review of the Yakama
Nation’s Response to the ISRP’s Step 1 Review of the Klickitat
Subbasin Anadromous Fishery Master Plan |
ISRP/ISAB
2005-15 |
Monitoring
and Evaluation of Supplementation Projects |
| 2005-14 |
Retrospective
Report 1997 - 2005 (plus
Appendix: The Evolution of Scientific
Review in the Columbia River Basin Fish and Wildlife Program) |
ISRP/ISAB
2005-13 |
Preliminary
Review of Draft Research Plan |
| 2005-12 |
Review
of Nez Perce Tribe's Response to the ISRP's Preliminary Step Two
Review of the Johnson Creek Artificial Propagation Enhancement
Project |
| 2005-11 |
Review
of Proposal to Improve the Lower Granite Dam Adult Salmonid Trap |
| 2005-10 |
Interim
Reply: Combined Step Review for Sekokini Springs Natural Rearing
Facility and Educational Center, Hungry Horse Mitigation, Project
#199101903 |
| 2005-9 |
Review
of Updated Proposed Action (UPA) Habitat Projects to Improve
Survival of Upper Columbia River Spring Chinook and Steelhead |
| 2005-8 |
Review
of the Select Area Fishery Evaluation Project |
| 2005-7 |
Step
1 Review of the Klickitat Subbasin Anadromous Fishery Master Plan |
| 2005-6 |
Step
review of the Johnson Creek Artificial Propagation Enhancement
Project |
| 2005-5 |
Review
of the All-H Analyzer (AHA) |
| 2005-4 |
ISRP
Preliminary Review of Sekokini Springs Master Plan |
| 2005-3 |
Combined
Step Review for Re-introduction of Lower Columbia River Chum Salmon
into Duncan Creek |
| 2005-2 |
Review
of the Chief Joseph Dam Hatchery Program Master Plan |
| 2005-1 |
Review
of Criteria and Checklist for Evaluating Proposals to Secure
Riparian Easements to Protect Tributary Habitat |
| 2004-17 |
Review
of Umatilla RM&E Plan |
| 2004-16 |
Estuary
and Lower Columbia Habitat Monitoring and RME Plan Reviews |
| 2004-15 |
Review
of Shoshone Paiute Tribe's Monitoring and Evaluation Plan for
Project 199701100 |
| 2004-14 |
Review
of Captive Propagation Program Elements: Programmatic Issue 12 for
the Mountain Snake and Blue Mountain Provinces |
| 2004-13 |
Scientific
Review of Subbasin Plans for the Columbia River Basin Fish and
Wildlife Program |
| 2004-12 |
Review
of the U.S. Army Corps of Engineers’ proposal: Review and evaluate
the success and relevancy of the Chief Joseph Dam wildlife
mitigation program |
| 2004-11 |
Review
of the Nez Perce Tribe-Department of Fisheries Resource
Management-Watershed Division's statistical design for monitoring
effectiveness of watershed restoration projects |
| 2004-10 |
ISRP
Step Two Review of the Northeast Oregon Hatchery (NEOH) Spring
Chinook Master Plan: Monitoring and Evaluation Plan |
| 2004-9 |
Review
of the Lower Columbia River Ecosystem Monitoring and Data Management
Project |
| 2004-8 |
Final
Review of the US Army Corps of Engineers' Anadromous Fish Evaluation
Program for FY2004 |
| 2004-7 |
Comments
on Flathead and Kootenai Subbasin Plan Presentations |
| 2004-6 |
Second
Review of Proposal to Evaluate the Biological Effects of the
Council's Mainstem Amendments on the Fisheries Upstream and
Downstream of Hungry Horse and Libby Dams |
2004-5
&
2004-5a |
Review
of Response to ISRP comments on Summer Spill Study Proposal:
Estimating the survival of sub-yearling Chinook salmon through
Bonneville Dam during two spill operation scenarios using
Radio-Telemetry: 2004 |
| 2004-4 |
Review
of Draft Clearwater Subbasin Plan (November 2003 version) |
| 2004-3 |
Preliminary
Review of Hungry Horse and Libby Proposal (also see final
review) |
ISRP/ISAB
2004-2 |
Comments
on the Pacific Northwest Aquatic Monitoring Partnership's (PNAMP)
Draft Recommendations for Monitoring in Subbasin Plans |
| 2004-2 |
Review
of Criteria for Evaluating Proposals to Secure Tributary Water for
2004 |
| 2004-1 |
Review
of Draft Action Agency and NOAA Fisheries RM&E Plan |
| 2003-14 |
Review
of Fiscal Year 2004 Pre-proposals for the US Army Corps of
Engineers' Anadromous Fish Evaluation Program |
| 2003-13 |
Review
of the Action Agencies' Draft Estuary Plan |
| 2003-12 |
Step
Two Review of the Northeast Oregon Hatchery Spring Chinook Master
Plan |
| 2003-11 |
Review
of Protocols for Counting Salmonids, Resident Fish, and Lampreys in
the Pacific Northwest |
| 2003-10 |
Review
of the Umatilla Fish Hatchery Monitoring and Evaluation Project
(199000500) document, "Comprehensive Assessment of Salmonid
Restoration and Enhancement Efforts in the Umatilla River
Basin" |
| 2003-9 |
Final
Review of Proposals Submitted in Response to Bonneville Power
Administration's March 14, 2003 Request for Studies for Reasonable
and Prudent Alternative Actions 182 and 184 of the 2000 Federal
Columbia River Power System Biological Opinion |
| 2003-8 |
Review
of Idaho Supplementation Studies |
| 2003-7 |
Review
of proposals for BPA's request for studies on RPAs 182 and 184 |
| 2003-6 |
Review
of revised mainstem/systemwide proposals for Research, Monitoring,
and Evaluation |
| 2003-5 |
Review
of Coeur d’Alene Tribe Trout Production Facility Master Plan (Step
One Submittal) |
| 2003-4 |
Review
of BPA’s Draft Request For Proposals for RM&E |
| 2003-2 |
Summary
of ISRP Reviews and Interactions with the Action Agencies’ RM&E
Effort |
| 2003-3 |
Review
of Draft Clearwater Subbasin Plan |
| 2003-1 |
Final
ISRP Review of Criteria for Evaluating Proposals to Secure Tributary
Water |
| 2002-15 |
Review
of Criteria for Evaluating Proposals to Secure Tributary Water |
| 2002-14 |
Final
Review of Fiscal Year 2003 Mainstem and Systemwide Proposals |
| 2002-13 |
Preliminary
Review of Fiscal Year 2003 Mainstem and Systemwide Proposals |
| 2002-12 |
Final
Step Review - Kalispel Tribe Resident Fish, Project 199500100 |
| 2002-11 |
Final
Review of Fiscal Year 2003 Proposals for the Upper and Middle Snake,
Columbia Cascade, and Lower Columbia and Estuary Provinces |
| 2002-10 |
Review
of project 200101500 - Echo Meadow Project |
| 2002-9 |
Review
of Revised Moses Lake Recreational Facility proposal |
| 2002-8 |
Review
of FY 2002 Innovative Proposals |
| 2002-7 |
Preliminary
ISRP Step Review - Kalispel Tribe Resident Fish, Project 199500100 |
| 2002-6 |
Lower
Snake River Compensation Plan Final Proposal Review for Columbia
Plateau, Blue Mountain and Mountain Snake Provinces |
| 2002-5 |
Review
of March 27, 2002 Draft Guidelines for Action Effectiveness Research
Proposals for FCRPS Offsite Mitigation Habitat Measures |
| 2002-4 |
Review
of Council Staff's Draft Research Plan for Fish and Wildlife in the
Columbia River Basin |
| 2002-3 |
Protocols
for the Inventory and Monitoring of Fish, Wildlife, and their
Habitats in the Pacific Northwest; Statement of Work by David H.
Johnson, Washington Department of Fish and Wildlife |
| |
ISRP
comments on Corps' response to document ISRP 2001-11 (Mar
4, 2002) |
| 2002-2 |
Preliminary
Review of Fiscal Year 2003 Proposals for the Upper and Middle Snake,
Columbia Cascade, and Lower Columbia and Estuary Provinces |
| 2002-1 |
Final
Review: Arrowleaf/Methow River Conservation Project |
| 2001-12A |
Final
Review of Fiscal Year 2002 Proposals for the Mountain Snake and Blue
Mountain Provinces |
| 2001-12B |
Lower
Snake River Compensation Plan Preliminary Proposal Review |
| 2001-12C |
ISRP
Step Two Review of the NEOH Spring Chinook Master Plan |
| 2001-11 |
Preliminary
review of the United States Army Corps of Engineers’ Bonneville
Decision Document Juvenile Fish Passage Recommendation October 2001
(also see ISRP comments
to Corps' response) |
| 2001-10 |
ISRP
Comments on CRITFC proposal for a Collaborative Center for Applied
Fish Science |
| 2001-9 |
Preliminary
Review of FY2002 Project Proposals in the Mountain Snake and Blue
Mountain Provinces |
| 2001-8 |
Final
Review of Fiscal Year 2002 Proposals for the Columbia Plateau
Province |
| 2001-7a |
Final
Review of Fiscal Year 2001 Action Plan Proposals including Responses
to ISRP Comments |
| 2001-7 |
Review
of Fiscal Year 2001 Action Plan Proposals |
| 2001-6 |
Preliminary
Review of FY 2002 Project Proposals for the Columbia Plateau
Province (410k PDF) |
| 2001-5 |
Review
of NMFS Proposal "Evaluate Hatchery Reform Principles" |
| 2001-4 |
Final
Review of FY 2002 Project Proposals for the Mountain Columbia
Province (includes addenda for Albeni Falls and Kalispal
Wildlife projects) |
| 2001-3 |
ISRP
Review of the Final Design of the Shoshone-Bannock/ Shoshone-Paiute
Joint Culture Facility (project #9500600) and August 6
addendum |
| 2001-2 |
Preliminary
Review of FY 2002 Project Proposals for the Mountain Columbia
Province (120k PDF) |
| 2001-1 |
Review
of FY 2001 High Priority Proposals for the Columbia River Basin Fish
and Wildlife Program (190k PDF) |
| 2000-10 |
Review
of Fiscal Year 2001 Innovative Proposals for the Columbia River
Basin Fish and Wildlife Program (100k PDF) |
2000-9
and
addendum |
Final
Review of Fiscal Year 2001 Project Proposals for the Columbia River
Gorge and Inter-Mountain Provinces (450k PDF)
and addendum
for Moses Lake proposal |
| 2000-8 |
Preliminary
Review of Fiscal Year 2001 Project Proposals for the Columbia River
Gorge and Inter-Mountain Provinces (300k PDF) |
| 2000-7 |
Partial
Step One of the Council’s Three-Step Review Process: Master Plan
for Feasibility Assessment of a White Sturgeon ‘Put and Take’
Consumptive Fisheries in Oxbow and Hells Canyon Reservoirs, Snake
River (70k PDF) |
| 2000-6 |
Step
1 of the Council’s 3-Step Review Process: Review of the Northeast
Oregon Hatchery Spring Chinook Master Plan (50k PDF) |
| 2000-5 |
Partial
Step 2 of the Council’s 3-Step Review Process: Review of the
Yakama Nation's Mid-Columbia Coho Reintroduction Feasibility Project
(50k PDF) |
| 2000-4 |
Review
of the Confederated Tribes of the Umatilla Indian Reservation’s
"Restoration Plan for Pacific Lampreys (Lampetra tridentata) in
the Umatilla River, Oregon" (15k PDF) |
|
2000-3 |
Review
of Databases Funded through the Columbia Basin Fish and Wildlife
Program |
| |
Letter
regarding review of the Nez Perce Tribal Hatchery Monitoring and
Evaluation Plan (PDF, Apr 3, 2000) |
| 2000-2 |
Steps
1-3 of the Council’s 3-Step Review Process: Review of the Tucannon
River Captive Broodstock Master Plan (100k PDF) |
| 2000-1 |
Step
1 of the Council’s 3-Step Review Process: Review of Coeur d’Alene
Tribe Trout Production Facility Master Plan (60k PDF) |
| 99-4 |
Response
Review of Fiscal Year 2000 Proposals (310k PDF) |
| 99-3 |
Prioritized
List of 42 Proposals Submitted for FY2000 Funding through the
Columbia Basin Fish and Wildlife Program (140k PDF) |
| 99-2 |
Volume
I: Review of the Columbia River Basin Fish and Wildlife Program for
Fiscal Year 2000 as Directed by the 1996 Amendment to the Northwest
Power Act (600k PDF) |
| 99-2A |
Volume
II: Review and Recommendations of Individual FY2000 Project
Proposals (910k PDF) |
| 99-1 |
Review
of the BPA Reimbursable Account Programs in the Columbia River Basin
as Requested in the Senate-House Conference Report on FY99 Energy
and Water Development Appropriations Bill |
| 98-1 |
Review
of the Columbia River Basin Fish and Wildlife Program for Fiscal
Year 1999 as Directed by the 1996 Amendment to the Northwest
Power Act (425k PDF) |
| 98-1A |
Appendix
A ISRP Comments on Proposals (240k PDF) |
| 97-2 |
Review
of "A Method and Criteria for Evaluating the Technical Merits
and Feasibility of Watershed/Habitat Projects" (30k PDF) |
|
97-1 |
Review
of the Columbia River Basin Fish and Wildlife Program for Fiscal
Year 1998 as directed by the 1996 amendment to the Power Act (225k PDF) |