Slide 5 of 9 Notes:
This graph shows the relative size of the Extra 1 hydro block.
As stated before, it is a fairly small hydro block averaging only about
280 MW in those months when it is available. We also show the size
of independent hydro projects and the size of the required spill
in spring months for migrating juveniles.