First 
Previous 
Next 
Last 

Index 
 
 

Slide 5 of 9 Notes:  


This graph shows the relative size of the Extra 1 hydro block.  As stated before, it is a fairly small hydro block averaging only about 280 MW in those months when it is available.  We also show the size of  independent hydro projects and the size of the required spill in spring months for migrating juveniles.